skip to content

#5519

Shanghai Metro AC14 and AC15

🇨🇳 China ·built by CNR Changchun Railway Vehicles· from 2008· rolling stock of Shanghai Metro Line 8

🚇 metro electric ✓ in service
Shanghai Metro AC14 and AC15, photo 1 of 2
1/2 Le Concorde· CC BY-SA 3.0

what is it?

The 06C02, 06C03, 08C02 and the 08C03 (formerly known as AC14 and AC15) are the main models of electric multiple unit currently used on Line 6 and Line 8. They were first entered service in November 2009 on Line 8. In 2014, AC14A renamed 06C02, AC14B renamed 06C03, AC15A renamed 08C02 and AC15B renamed 08C03.

who runs it

base stats

  • speed 80 km/htop speed
  • seats 200passengers
  • built 382made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 18 years ago, in 2008.
  • 77.9 m long: about 17 cars parked nose to tail.
  • Seats 200: 4 full city buses (~50 seats each).

metro: Urban rapid transit: frequent, high-capacity trains, often underground.

spec sheet

built
2008
in service from
2008
status
in service
number built
382
kind
Class C EMU
traction
electric
origin
🇨🇳 China
builders
CNR Changchun Railway Vehicles
designer
TRICON Design
operators
Shanghai Shentong Metro Group Co., Ltd.
top speed
80 km/h
power
—
gauge
1,435 mm standard gauge
formation
Tc-Mp+Mp-Tc, Tc-Mp-M-M+M-Mp-Tc
length
77.9 m
capacity
200 passengers

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q10868075, Wikipedia: Shanghai Metro AC14 and AC15 (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 7f71e88 source