#5518
Shanghai Metro AC09 and AC10
🇨🇳 China ·built by Changchun Alstom Railway Vehicles Co. Ltd.· from 2008· rolling stock of Shanghai Metro Lines 7, 9 and 12
2 photos from Wikimedia Commons · credits & licences
- 1. Shanghai Metro Line 7 07A01 (AC10) Train: TimShi· CC BY-SA 3.0
- 2. 09A02 train set 0937 approaching Sheshan Station 20250621124504: XiaYZ2023· CC BY-SA 4.0
what is it?
The 07A01, 09A02 and the 12A01 (formerly known as AC09 and AC10) are a class of electric multiple unit currently used on Line 7, Line 9 and Line 12 of Shanghai Metro. They were first entered service in November 2008 on Line 9. In 2014, AC10 renamed 07A01, AC09A renamed 09A02 and AC09B renamed 12A01.
who runs it
base stats
Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.
fun facts
- First built 18 years ago, in 2008.
- 140 m long: about 31 cars parked nose to tail.
- Seats 310: 6 full city buses (~50 seats each).
metro: Urban rapid transit: frequent, high-capacity trains, often underground.
spec sheet
- built
- 2008
- in service from
- 2008
- status
- in service
- number built
- 744
- kind
- Class A EMU
- traction
- electric
- origin
- 🇨🇳 China
- builders
- Changchun Alstom Railway Vehicles Co. Ltd.
- designer
- TRICON Design
- operators
- Shanghai Shentong Metro Group Co., Ltd.
- top speed
- 80 km/h
- power
- —
- gauge
- 1,435 mm standard gauge
- wheel arrangement
- 2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
- formation
- Tc-Mp-M+M-Mp-Tc
- length
- 140 m
- capacity
- 310 passengers
From the Wikipedia infobox and Wikidata. Blank means the sources don't say.
Sources: Wikidata Q10868070, Wikipedia: Shanghai Metro AC09 and AC10 (CC BY-SA 4.0).Updated 2026-10-25.
