skip to content

#0097

South Australian Railways locomotives 1–3

🇬🇧 United Kingdom ·built by William Fairbairn & Sons· from 1855· Mid-19th century locomotives

South Australian Railways locomotives 1–3, photo 1 of 1
1/1 Government Photolithographer (S.A.)· Public domain

what is it?

South Australian Railways locomotives 1, 2 and 3, the first locomotives delivered to the railway, arrived in time for deployment on the soon-to-be-opened Adelaide to Port Adelaide line. Built in 1855 by William Fairbairn & Sons in Manchester, UK, they arrived at Port Adelaide on the brig Theodore in November 1855, and were unloaded in January 1856; they were assembled and placed service in the succeeding three months. They were named Adelaide, Victoria and Albert but were numbered (1 to 3 respectively) only after many years, and a locomotive class was never assigned to them.

who runs it

base stats

  • weight 25.4 tin working order
  • built 3made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 171 years ago, in 1855.
  • Weighs about as much as 4 African elephants (~6 t each).
  • 13.1 m long: about 3 cars parked nose to tail.
  • Served for 18 years (1856–1874).

steam locomotive: Burns coal, wood or oil to boil water; the steam drives pistons that turn the wheels.

spec sheet

built
1855
in service from
1856
retired
1874
status
retired
number built
3
kind
Steam
traction
steam
origin
🇬🇧 United Kingdom
builders
William Fairbairn & Sons
operators
South Australian Railways
top speed
—
power
—
wheel arrangement
2-4-0
length
13.1 m
weight
25.4 t

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q24892153, Wikipedia: South Australian Railways locomotives 1–3 (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 7f71e88 source