skip to content

#1397

MR electric units

built by Unknown builder· from 1908

what is it?

The Midland Railway experimented with electrification on its Heysham–Morecambe–Lancaster line in Lancashire, England. Electric trains started to run over this route in 1908, using the overhead 6.6 kV, 25 Hz AC electric supply installed and generated at the MR's own power station in Heysham. The electric multiple units consisted of three driving motor coaches and six driving trailer coaches.

base stats

  • built 3made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 118 years ago, in 1908.
  • Served for 45 years (1908–1953).

multiple unit: A self-propelled train: motors are spread under the passenger cars, so no separate locomotive.

spec sheet

built
1908
in service from
1908
retired
1953
status
retired
number built
3
kind
multiple unit
traction
electric
builders
Unknown builder
top speed
—
power
—
formation
4 cars

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q6717651, Wikipedia: MR electric units (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 704880d source