skip to content

#1927

SBB Be 4/7

🇨🇭 Switzerland ·built by Société Anonyme des Ateliers de Sécheron· from 1921· class of 6 Swiss electric locomotives

SBB Be 4/7, photo 1 of 2
1/2 lhasarabat· Public domain

what is it?

The Be 4/7, nicknamed the Big Sécheron is an electric locomotive for use on the Gotthard line by the SBB. It represents an early experiment in electric locomotive design. In contrast to the other locomotives of the era, the Be 4/7 did not have rod drive, but individual electrically-driven axles mounted directly on bogies.

base stats

  • speed 80 km/htop speed
  • built 6made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 105 years ago, in 1921.

electric locomotive: Draws power from overhead wires or a third rail and pulls separate carriages.

spec sheet

built
1921–1922
retired
1976
status
retired
number built
6
kind
electric locomotive
traction
electric
origin
🇨🇭 Switzerland
builders
Société Anonyme des Ateliers de Sécheron, Swiss Locomotive and Machine Works
top speed
80 km/h
power
—
wheel arrangement
(1’Bo1’)(Bo1’)

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q2205143, Wikipedia: SBB Be 4/7 (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 7f71e88 source