#6085· New Tube for London
London Underground 2024 Stock
🇬🇧 United Kingdom ·built by Siemens Mobility· from 2026· type of future rolling stock used on the London Underground
10 photos from Wikimedia Commons · credits & licences
- 1. London Underground 2024 stock at Acton Town during a test run (March 2026) (2): Fortek67· CC BY-SA 4.0
- 2. London Underground 2024 tube stock approaching Turnham Green during a test run (March 2026) (1): Fortek67· CC BY-SA 4.0
- 3. London Underground 2024 stock carriages: Fortek67· CC BY-SA 4.0
- 4. London Underground 2024 Stock 38062, Hammersmith: Elshad· CC BY 4.0
- 5. London Underground 2024 stock at Acton Town during a test run (March 2026) (1): Fortek67· CC BY-SA 4.0
- 6. London Underground 2024 stock at Acton Town during a test run (March 2026) (3): Fortek67· CC BY-SA 4.0
- 7. London Underground 2024 stock at Hammersmith during a test run (March 2026) (1): Fortek67· CC BY-SA 4.0
- 8. London Underground 2024 Stock during testing at Hammersmith station (1): Fortek67· CC BY-SA 4.0
- 9. London Underground 2024 Stock during testing at Hammersmith station (2): Fortek67· CC BY-SA 4.0
- 10. London Underground 2024 stock passing Chiswick Park during a test run (March 2026) (1): Fortek67· CC BY-SA 4.0
what is it?
The London Underground 2024 Stock, known during development as the New Tube for London (NTfL), is a type of London Underground rolling stock built by Siemens Mobility at its facilities in Goole, United Kingdom and Vienna, Austria. It is part of the Siemens Inspiro family of metro and rapid-transport trains. An initial batch of 94 nine-car trains has been ordered at a cost of £1.5 billion to replace the 1973 Stock trains on the Piccadilly line, with options for a total of 250 trains allowing replacement of all existing trains on the deep-level Bakerloo, Central and Waterloo & City lines.
base stats
Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.
fun facts
- First built 0 years ago, in 2026.
- 2.5 MW is about 29 family cars (~85 kW each) flat out.
- Weighs about as much as 26 African elephants (~6 t each).
- 114 m long: about 25 cars parked nose to tail.
- Seats 256: 5 full city buses (~50 seats each).
- Served for 1 years (2026–2027).
metro: Urban rapid transit: frequent, high-capacity trains, often underground.
spec sheet
- built
- 2026
- in service from
- 2026
- retired
- 2027
- status
- retired
- number built
- —
- kind
- Deep-level tube
- traction
- electric
- origin
- 🇬🇧 United Kingdom
- builders
- Siemens Mobility
- top speed
- 100 km/h
- power
- 2.5 MW
- gauge
- 1,435 mm standard gauge
- electric system
- Fourth rail, 630 or 750 V DC
- formation
- 9 cars per train
- length
- 114 m
- weight
- 155 t
- capacity
- 256 passengers
- Dutch name
- New Tube for London
From the Wikipedia infobox and Wikidata. Blank means the sources don't say.
Sources: Wikidata Q16998780, Wikipedia: London Underground 2024 Stock (CC BY-SA 4.0).Updated 2026-10-25.
