skip to content

#3665

ER9 electric trainset

🇺🇦 Ukraine ·built by Riga Railway Carriage Building Factory· from 1962· electric multiple unit by Riga railcar factory

ER9 electric trainset, photo 1 of 7
1/7 Изотов Д.М.· CC BY 3.0

what is it?

For servicing suburban commuter lines, electrified on 25 kV, AC, the Railcar Manufacturing Plant of Riga produced ER9, then ER9P and other modifications of electric trainsets in the 1962-2002 period. The mass production of these trains had begun in 1964.

who runs it

base stats

  • speed 130 km/htop speed

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 64 years ago, in 1962.
  • 19.6 m long: about 4 cars parked nose to tail.

multiple unit: A self-propelled train: motors are spread under the passenger cars, so no separate locomotive.

spec sheet

built
1962
in service from
1962
number built
—
kind
multiple unit
traction
electric
origin
🇺🇦 Ukraine
builders
Riga Railway Carriage Building Factory, Tverskoy Vagonostroitelniy Zavod
operators
Ukrainian Railways
top speed
130 km/h
power
—
gauge
1,520 mm Russian broad gauge
electric system
Catenary
length
19.6 m

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q1108014, Wikipedia: ER9 electric trainset (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 7f71e88 source