skip to content

#1868

SBB Be 4/6 12301

๐Ÿ‡จ๐Ÿ‡ญ Switzerland ยทbuilt by Oerlikon Worksยท from 1919ยท class of 1 Swiss test electric locomotive

what is it?

The Be 4/6 12301 was a locomotive ordered by Schweizerische Bundesbahnen (SBB, Swiss Federal Railways) in June 1917 to test the electrification of the Gotthard railway. It was one of four test units ordered. It was used for passenger and freight services from 1919 to 1937, and was destroyed in a fire in 1963.

who runs it

base stats

  • speed 75 km/htop speed
  • weight 107 tin working order
  • built 1made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 107 years ago, in 1919.
  • Weighs about as much as 18 African elephants (~6 t each).
  • 16.2 m long: about 4 cars parked nose to tail.
  • Served for 44 years (1919โ€“1963).

electric locomotive: Draws power from overhead wires or a third rail and pulls separate carriages.

spec sheet

built
1919
in service from
1919
retired
1963
status
retired
number built
1
kind
Electric
traction
electric
origin
๐Ÿ‡จ๐Ÿ‡ญ Switzerland
builders
Oerlikon Works
operators
Swiss Federal Railways
top speed
75 km/h
power
โ€”
gauge
1,435 mm standard gauge
electric system
Catenary
wheel arrangement
(1โ€™B)+(B1โ€™)
length
16.2 m
weight
107 t
nicknames
Doryphore

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q1430132, Wikipedia: SBB Be 4/6 12301 (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 44379b9 source