skip to content

#5306

Meitetsu 1380 series

🇯🇵 Japan ·built by Nippon Sharyo· from 2003· Japanese electric multiple unit train type

Meitetsu 1380 series, photo 1 of 10
1/10 Tennen-Gas· CC BY-SA 3.0

what is it?

The Meitetsu 1380 series (名鉄1380系) was an electric multiple unit (EMU) train type operated by the private railway operator Nagoya Railroad (Meitetsu) in Japan from 2003 until September 2015. The unique four-car train was converted from a former 1030/1230 series trainset which sustained accident damage in 2002.

who runs it

base stats

  • speed 120 km/htop speed
  • built 4made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 23 years ago, in 2003.
  • Served for 12 years (2003–2015).

multiple unit: A self-propelled train: motors are spread under the passenger cars, so no separate locomotive.

spec sheet

built
2003
in service from
2003
retired
2015
status
retired
number built
4
kind
multiple unit
traction
electric
origin
🇯🇵 Japan
builders
Nippon Sharyo
operators
Nagoya Railroad
top speed
120 km/h
power
—
gauge
1,067 mm Cape gauge
electric system
1,500 V DC
formation
4 cars per set

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q20896923, Wikipedia: Meitetsu 1380 series (CC BY-SA 4.0).Updated 2026-10-25.

stan runge e33afe5 source