skip to content

#6268

Gauge Change Train

🇯🇵 Japan ·built by Kawasaki Heavy Industries· experimental Japanese train class

Gauge Change Train, photo 1 of 1
1/1 Spaceaero2· CC BY-SA 3.0

what is it?

The Gauge Change Train (GCT) (Japanese: フリーゲージトレイン; lit. 'Free Gauge Train') was a Japanese research and development project launched in 1994 to create a high-speed train equipped with variable-gauge axles, enabling through operation between the 1,435 mm (4 ft 8+1⁄2 in) standard gauge Shinkansen network and the 1,067 mm (3 ft 6 in) narrow-gauge conventional rail network. Three prototype electric multiple unit (EMU) trains—two three-car sets and one four-car set—were constructed for testing. The first operated from 1998 to 2006, the second from 2006 to 2014, and a third-generation train began testing in 2014; however, testing was later suspended due to technical issues with the bogies.

base stats

  • speed 300 km/htop speed
  • power 190 kWpower output
  • built 3made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • Top speed is 2.3× a car on the Dutch motorway (130 km/h).
  • At full speed it would cover Amsterdam–Utrecht (≈ 40 km) in 8 minutes.
  • 23.1 m long: about 5 cars parked nose to tail.

high-speed train: Built for 200–350 km/h on dedicated lines, like the TGV, ICE or Shinkansen.

spec sheet

built
—
number built
3
kind
high-speed train
traction
electric
origin
🇯🇵 Japan
builders
Kawasaki Heavy Industries, Kinki Sharyo, Japan Transport Engineering Company
top speed
300 km/h
power
190 kW
gauge
1,067 mm Cape gauge
electric system
Overhead line:, 3, 3, 3, 3, 3
formation
3-car set
length
23.1 m

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q1331375, Wikipedia: Gauge Change Train (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 9e89a61 source