skip to content

#5101

China Railway NZJ

🇨🇳 China ·built by CRRC Tangshan Co., Ltd.· from 1998· diesel multiple unit of China

China Railway NZJ, photo 1 of 1
1/1 跨越1983· CC BY-SA 3.0

what is it?

The NZJ "Lushan", also registered as the NZJ1 are a class of diesel multiple unit (DMU) of China Railway. These sets were built by Tangshan Locomotive in a 2M2T layout of four cars with Cummins diesel engines and Siemens electrical equipment. Three sets were built in total between 1998 and 2000, with two operated by Nanchang Railway Bureau and one by Kunming Railway Bureau.

who runs it

base stats

  • speed 120 km/htop speed
  • weight 17 tin working order
  • built 6made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 28 years ago, in 1998.
  • Weighs about as much as 3 African elephants (~6 t each).
  • 105 m long: about 23 cars parked nose to tail.
  • Served for 12 years (1998–2010).

multiple unit: A self-propelled train: motors are spread under the passenger cars, so no separate locomotive.

spec sheet

built
1998
in service from
1998
retired
2010
status
retired
number built
6
kind
multiple unit
traction
diesel
origin
🇨🇳 China
builders
CRRC Tangshan Co., Ltd.
operators
China State Railway Group, China Railway Nanchang Group
top speed
120 km/h
power
—
gauge
1,435 mm standard gauge
formation
Mc-T-T-Mc
length
105 m
weight
17 t

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q10851897, Wikipedia: China Railway NZJ (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 7f71e88 source