skip to content

#5135

China Railway KDZ1A

🇨🇳 China ·built by CRRC Changchun Railway Vehicles Co., Ltd.· from 1999· electric multiple unit of China

China Railway KDZ1A, photo 1 of 1
1/1 User:Vmenkov· CC BY-SA 3.0

what is it?

The KDZ1A "Chuncheng" was an early attempt at building an electric multiple unit in China with the participation of Changchun Railway Vehicles, Zhuzhou Institute and Kunming railway bureau. Development was completed in 1999 in time for the Kunming World Horticultural Exposition. As its predecessor, the KDZ1 never operated commercially, the KDZ1A became the first Chinese EMU to be in revenue service, although it was in service for only 10 years before being withdrawn.

who runs it

base stats

  • speed 132 km/htop speed
  • seats 600passengers
  • built 1made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 27 years ago, in 1999.
  • 25.8 m long: about 6 cars parked nose to tail.
  • Seats 600: 12 full city buses (~50 seats each).
  • Served for 10 years (1999–2009).

multiple unit: A self-propelled train: motors are spread under the passenger cars, so no separate locomotive.

spec sheet

built
1999
in service from
1999
retired
2009
status
retired
number built
1
kind
multiple unit
traction
electric
origin
🇨🇳 China
builders
CRRC Changchun Railway Vehicles Co., Ltd.
designer
Changchun Railway Vehicles, Zhuzhou Institute, Zhuzhou Electric Locomotive
operators
China Railway Kunming Group
top speed
132 km/h
power
—
formation
Tc-M-T-M-M-Tc
length
25.8 m
capacity
600 passengers

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q11088756, Wikipedia: China Railway KDZ1A (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 7f71e88 source