skip to content

#1557

Southern Pacific class MC-4

๐Ÿ‡บ๐Ÿ‡ธ United States ยทbuilt by Baldwin Locomotive Worksยท from 1911ยท class of 12 American 2-8-8-2 Mallet cab forward locomotives all rebuilt as SP AC-2 class

what is it?

Southern Pacific Railroad's MC-4 class of steam locomotive was the second class ordered and built as cab forward locomotives. Southern Pacific (SP) found the MC-2 class sufficient for a proof-of-concept for cab forward locomotives and sought to continue with now tested designs. In service, SP found that the locomotives were a little too slow for the traffic needs.

who runs it

base stats

  • weight 196 tin working order
  • built 12made in total

Bars compare against all trains: 600 km/h (maglev), 1,700 seats; power, weight and number built on a log scale up to 20 MW, 1,000 t and 20,000 built.

fun facts

  • First built 115 years ago, in 1911.
  • Weighs about as much as 33 African elephants (~6 t each).
  • Served for 9 years (1911โ€“1920).

steam locomotive: Burns coal, wood or oil to boil water; the steam drives pistons that turn the wheels.

spec sheet

built
1911
in service from
1911
retired
1920
status
retired
number built
12
kind
Steam
traction
steam
origin
๐Ÿ‡บ๐Ÿ‡ธ United States
builders
Baldwin Locomotive Works
operators
Southern Pacific Transportation Company
top speed
โ€”
power
โ€”
gauge
1,435 mm standard gauge
wheel arrangement
2-8-8-2
weight
196 t

From the Wikipedia infobox and Wikidata. Blank means the sources don't say.

Sources: Wikidata Q7570313, Wikipedia: Southern Pacific class MC-4 (CC BY-SA 4.0).Updated 2026-10-25.

stan runge 7f71e88 source